KingPo Completed Delivery of Test Equipments for TUV Rheinland Indonesia
April 21, 2022
KingPo Completed Delivery of Test Equipments for TUV Rheinland Indonesia
It includes:
IEC 60529 Waterproof and dustproof ingress protection,IEC60598-1 test equipments,IEC 60068-2-75 IK tester(Pendulum Hammer) ,IEC 62368-1 Inclined Plane & Protractor
Equipments list:
1 | Ball pressure test apparatus |
2 | Standard Test Finger-IEC61032 Test Probe B |
3 | Unjoint Test Finger-IEC61032 Test Probe 11 |
4 | Test probe 19 |
5 | IEC60598-1-cl.4.4.4- Torque Tester |
6 | IEC60598-1 clause 4.9.2/4.18.1Temperature and humidity chamber |
7 | IEC 60529 Drip Box, IPX1/IPX2 |
8 | IEC 60529 oscillating tube, with rotate table IPX3/IPX4 |
9 | IEC 60529 Hose Nozzle 6.3/12.5mm, IPX5/IPX6 |
10 | water tank wit pressurization device for IPx7/8 |
11 | IP5X IP6X Dust Test Chamber |
12 | Programmable DC Power Supply |
13 | Programmable DC Power Supply |
14 | Thermal insulating material |
15 | IEC60598-1-Annex D (Draft-proof enclosure ) |
16 | Center Puncher |
17 | IK tester IK07-10(Pendulum Hammer)) |
18 | Inclined Plane & Protractor |
19 | Digital Push Pull Tester |
20 | IEC60061-1 Test Caps |
21 | IEC60598-1-cl.4.4.4-G5/G13 gauges |
22 | Test Screwdriver / Spanner |
23 | Weighting Device & Load Device |
24 | Digimatic Micrometer |
25 | Digimatic Caliper |
26 | Test Chain |
27 | Glass test Shelves |
28 | 200meter Thermocouple |
29 | Heating Cabinet/Oven |
30 | Stopwatch |
31 | Steel ball |
32 | Cheesecloth |
33 | EN 60598-2-20-cl.20.12.3 Flat probe |
34 | Multimeter |
35 | Closeable glass vessel (Decicator) |
36 | 0.5J Spring Impact Hammer |
37 | Test circuit for metal halide luminaires |
38 | IEC 60598-2-17:2017 clause 17.7.4 Load devices |
latest company news
-
12 Feb, 2025
-
10 Feb, 2025
-
5 Nov, 2024
-
5 Nov, 2024
-
5 Nov, 2024
-
22 Sep, 2024
Mail Us