• IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.
Good price IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. online

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

Product Details:

Place of Origin: China
Brand Name: KingPo
Certification: ISO17025 Calibration certificate
Model Number: KP-NL-001

Payment & Shipping Terms:

Minimum Order Quantity: 1
Price: To be quoted
Packaging Details: safety carton pack or plywood box
Delivery Time: 7 working days
Payment Terms: T/T
Supply Ability: 100 sets per month
Contact Now

Detail Information

Standard: IEC61215-2-MQT14.2 Working Position: 1
Wire Diameter: 0-60mm Torque Range: 0.1Nm、0.15Nm、0.35Nm、0.6Nm ,0.8 Nm,0.9 Nm 1.0 Nm,1.2Nm
External Dimenstion: 430×180×250(W×D×H) Weight: 50Kg
High Light:

led testing equipment

,

led lamp testing equipment

Product Description

 

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

Introduction

1.1 Purpose

This machine is mainly used for torque test after retention test. The test time is one minute and the torque value can be realized according to the standard configuration of different weights.

1.2 Standard

IEC61215-2-MQT14.2

1.3 Technical parameter

No Item Spec
1 Working position 1
2 Wire diameter 0-60mm
3 Torque range 0.1Nm,0.15Nm,0.35Nm,0.6Nm ,0.8 Nm,0.9 Nm 1.0 Nm,1.2Nm
4 External dimenstion 430×180×250(W×D×H)
5 Weight 50Kg

 

Installation

2.1 Disassembling inspection

1. Check whether the instrument has been damaged or broken in transit;

2. Check whether the equipment is inverted;

3. Check whether the specifications on the nameplate are consistent with the order’s;

4. Check that the packing list is consistent with the object.

Do not use this instrument if any of the above occurs, and contact us in time.

2.2 Installation requirements

1. This instrument should be placed on a horizontal and stable worktable. If it is uneven, it should be adjusted first.

2. Operation ambient temperature :25 + 10℃, relative humidity: 50±30%RH

 

Operation

3.1 Structure

1. Substrate: provide support for parts above.

2. Sample fixture: for holding sample.

3. Rotary clamping head: used for holding the end of the plug.

4. Weight lifting wheel: radius 50mm (i.e. torque lever).

5. Weight: see 1.3 in detail.

3.2 Procedure

Please follow the following steps:

1. Select the suitable sample to insert the end of the power cord into the rotary clip, rotate the clamp and tighten.

2. Put the sample end into the sample holder and hold it firmly after tightening.

3. Hang required weights on the hanging wheel line, twist it for 1 ~ 2 laps.

4. After the load is maintained to the standard time, take off the sample.

5. Finish operation.

 

Maintenance

4.1 Daily maintenance

1.Cleaning: the surface of the instrument often needs to be cleaned and cleaned by anti-rust oil and dry cloth to prevent the dead or corroded parts of the unit.

2. Cleaning: make daily check list and check the device regularly to keep it clean.

 

Calibration:

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. 0

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. 1

 

 

 

Want to Know more details about this product
I am interested in IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.