MOQ: | 1 |
Price: | To be quoted |
Standard Packaging: | safety carton pack or plywood box |
Delivery Period: | 25 working days |
Payment Method: | 100% T/T in advance |
Supply Capacity: | 5 units per month |
UL 962A Figure SB16.1 Abrupt Pull Test Apparatus for testing plug
Operation procedures:
1. Place the device on a smooth surface and lock the anchor
2. Connect the device to the power supply
3. Turn on the power switch
4. Click the touch screen "Origin" button
5. Install test sample.
6. Set “hight”:254mm/178mm, Set“test time”:25
7. Click "Start" to start the test
MOQ: | 1 |
Price: | To be quoted |
Standard Packaging: | safety carton pack or plywood box |
Delivery Period: | 25 working days |
Payment Method: | 100% T/T in advance |
Supply Capacity: | 5 units per month |
UL 962A Figure SB16.1 Abrupt Pull Test Apparatus for testing plug
Operation procedures:
1. Place the device on a smooth surface and lock the anchor
2. Connect the device to the power supply
3. Turn on the power switch
4. Click the touch screen "Origin" button
5. Install test sample.
6. Set “hight”:254mm/178mm, Set“test time”:25
7. Click "Start" to start the test